Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Contact

Using modular construction, Vanguard has built a Central Sterile Services Department in Strasbourg

Crucial to the success of a project like this is the high Pre-Manufactured Value that Vanguard achieves: for this facility, the PMV was 90%

Built at Vanguard's factory in Hull, using modern methods of construction, this facility is providing alternative capacity during an extensive refurbishment. With 4 washers, 3 sterilisers and ancillary equipment, it's replacing the entire surgical service for a major University Hospital in France.

A combination of high quality and low cost means that modular facilities like these are viable for even a relatively short refurbishment project. Crucial to the success of a project like this is the high Pre-Manufactured Value Vanguard achieves: for this facility, the PMV was 90%. Completing more work in the factory means there is greater control over quality, and much less chance of delays caused by the weather. Manufacturing of the building coincides with the on-site ground works, meaning that the duration of the project is shorter, and the disruption to hospital activities and the inconveniencing of staff, patients, visitors and neighbours, are reduced.

The modules were delivered to the hospital site with four washers, three steam-sterilisers and a hydrogen peroxide low-temperature steriliser already installed.

The more work completed in the factory, the better the quality control.

This modular facility replaces the hospital's whole surgical sterile services department during refurbishment.

The layout of the modular CSSD facility, installed at the University Hospital in Strasbourg.

Are you looking for a similar facility?

Contact us:

+44 (0)1452 651850info@vanguardhealthcare.co.uk

Related case studies

Newcastle Westgate Cataract Centre, NHS Foundations Trust

The Newcastle Westgate Cataract Centre has been installed to tackle the significant backlog in patients waiting for routine cataract surgery. Since its installation, the facility has seen the average time spent in the facility decrease from 3-4 hours to between 45 minutes and an hour.
Read more

Bergman Clinics, Rijswijk, the Netherlands

We gladly accepted the challenge of building an operating theatre complex, containing two operating theatres and a nursing ward
Read more

Isala Hospital, Zwolle, the Netherlands

New modular combined treatment centre increases efficiency at Isala Hospital.
Read more

Vanguard Healthcare Solutions
Unit 1144 Regent Court, The Square, Gloucester Business Park, Gloucester, GL3 4AD

crossmenu

It looks like you are in the United States

We have a different site (www.q-bital.com) which better suits your location

Click here to change sites

Stay on this site