Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Contact

Blackpool Teaching Hospitals NHS Foundation Trust

Modular ward at the Blackpool Victoria Hospital

The need 

Additional overnight ward capacity was required to for the Trust’s Emergency Village programme which supports the Emergency Department. A 3-storey, purpose-built building currently houses Critical Care and Same Day Emergency Care facilities, the addition of a further ward would help the hospital to ease waiting list backlogs. 

The plan

In collaboration with the hospital team, a plan was created for a 24-bed modular ward, bespoke to the needs of the Trust, with 3 single rooms plus 21 beds in shared rooms and all necessary support rooms and facilities. 

The solution

Our solution of a bespoke modular Healthcare Space with a 904m2 footprint was to be built using modern methods of construction at our modular manufacturing facility in the Netherlands. At the same time, preliminary and ground works could be performed on-site helping to shorten the overall timescale. 

The modular ward would be transported to the hospital for on-site construction and commissioning. A 70-metre corridor would be created provide a link from the new facility to the hospital building. All construction followed HTM standards and associated HBNs for a clinical building that is used to provide ward space. 

One of our principal designers created the full facility design (unit designs, drawings, specification). Our team have overall responsibly for project management, site survey and planning. We partnered with HCT Construction Consultants who provided a principal contractor with responsibility for CDMC to ensure compliance with CDM 2015 Regulations.

The outcome

Vanguard commissioned the facility within 5 months of the start of the project and continue to perform the on-going maintenance and servicing of the unit.  

Our partnership with HCT Construction Consultants

We partnered with HCT Construction Consultants to provide the CDM management and project management. The initial site survey (November 2021) made it clear that, due to the proposed position of the new facility, this project would require an extensive level of site management to ensure essential hospital services were not disrupted, whilst targeting a quick build to minimise the on-site construction phase. HCT brought a wealth of experience from numerous NHS construction projects delivered over the years.Vanguard and the HCT team integrated seamlessly with Atlas Healthcare Facilities and Property Management (a wholly owned subsidiary of Blackpool Teaching Hospitals NHS Foundation) and the Blackpool Victoria Hospital clinical and management team.  Weekly meetings were established from the outset with all key stakeholders in place and with full onsite support from the Vanguard team and sub-contractors from February 2022 in advance of the facility delivery.

Are you looking for a similar facility?

Contact us:

+44 (0)1452 651850info@vanguardhealthcare.co.uk

Related case studies

Newcastle Westgate Cataract Centre, NHS Foundations Trust

The Newcastle Westgate Cataract Centre has been installed to tackle the significant backlog in patients waiting for routine cataract surgery. Since its installation, the facility has seen the average time spent in the facility decrease from 3-4 hours to between 45 minutes and an hour.
Read more

Bergman Clinics, Rijswijk, the Netherlands

We gladly accepted the challenge of building an operating theatre complex, containing two operating theatres and a nursing ward
Read more

Isala Hospital, Zwolle, the Netherlands

New modular combined treatment centre increases efficiency at Isala Hospital.
Read more

Vanguard Healthcare Solutions
Unit 1144 Regent Court, The Square, Gloucester Business Park, Gloucester, GL3 4AD

crossmenu

It looks like you are in the United States

We have a different site (www.q-bital.com) which better suits your location

Click here to change sites

Stay on this site